Video tour – September 2024

Video tour in early September 2024 as the final phase of plastering is underway

Installing the polished concrete floor – June 2024

Installation process for the polished concrete floor

Video tour – April 2024

Video tour in mid April 2024 after most of the glazing was installed

Time lapse of first floor and roof – December 2023 to February 2024

Erecting the scaffolding and building the first floor walls and main roof structure

Time lapse of steels and ground floor walls – October and November 2023

Erecting the scaffolding, installing steels and building ground floor load bearing walls

Time lapse of groundworks – August 2023

Pouring the concrete foundations and installing the block and beam floor slab

Concrete pour – July 2023

Pouring the concrete foundations

Boreholes – April 2023

Drilling the second of three boreholes for the ground source heat pump

Time lapse of demolition – March 2023

Time lapse video of demolishing the old bungalow

The original house and plot

November 2022: A walk around the inside of the house. It gives you a good idea of the very odd layout we lived with for 18 months!
November 2022: A walk around the gardens and the rest of the plot.